Has my stock been accused of fraud?Join over 160k users who know.

Ticker Price Change($) Change(%) Shares Volume Prev Close Open Gain($) Gain(%)
Ticker Status Jurisdiction Filing Date CP Start CP End CP Loss Deadline
Ticker Case Name Status CP Start CP End Deadline Settlement Amt
Ticker Name Date Analyst Firm Up/Down Target ($) Rating Change Rating Current

News

Dril-Quip Achieves Milestone With Installation Of Its First XPAK-De 18" X 22" Expandable Liner Hanger For Petrobras

Author: Benzinga Newsdesk | November 07, 2023 12:02pm

Dril-Quip, Inc. (NYSE:DRQ), (the "Company" or "Dril-Quip"), announced today the successful installation of its first 18" x 22" XPAK-De Expandable Liner Hanger in a Santos Basin deepwater pre-salt exploratory well for the Sagitario Location, operated by Petrobras (60%) in partnership with Repsol Sinopec Brasil (20%) and Shell (20%).

The large diameters and extended durations required at such depths presented significant challenges, requiring years of dedicated research, development, and testing by Dril-Quip's team, all aimed at creating a product capable of withstanding the harsh conditions of deepwater environments. By eliminating the need for contingency sub-mudline adapters, this technology can accelerate the Well construction process, lower operating costs and reduce risks associated with deepwater drilling operations.

"This achievement is a testament to the collaborative effort between Dril-Quip and Petrobras, demonstrating what can be accomplished through shared expertise and dedication to innovation" said Steve Chauffe, Dril Quip's Vice President - Well Construction. "Recognition is due to our dedicated engineering and Brazil operations team, whose expertise and commitment ensured the successful execution of this operation."

Posted In: DRQ PBR

CLASS ACTION DEADLINES - JOIN NOW!

NEW CASE INVESTIGATION

CORE Finalist